Bamboobootstrapfailed:Faile-创新互联
Bamboo bootstrap failed: Failed to run pre-bootstrap upgrade tasks
Skip to end of metadata
Problem
After installing / starting Bamboo the following message is shown on the UI:
The following appears in the atlassian-bamboo.log
1
Bamboo bootstrap failed: Unable to run pre-bootstrap upgrade tasks as your support period has ended. Please contact Atlassian and https://support.atlassian.com
原因
An expired key is being loaded by Bamboo during startup.
解決状況
This error happens when a customer has got 2 licenses on their account but the one that already expired loaded into their Bamboo.
The property below on your
1
Here are the steps to fix this:
Stop your Bamboo instance
Backup the bamboo.cfg.xml file somewhere else in your file system
Login to MyAtlassian
Retrieve the valid license key
Copy and paste the new license key on the property below, overwriting the one that expired:
1
(valid license value here)
Restart your Bamboo instance
https://confluence.atlassian.com/bamkb/unable-to-run-pre-bootstrap-upgrade-tasks-as-your-support-period-has-ended-762874747.html
另外有需要云服务器可以了解下创新互联scvps.cn,海内外云服务器15元起步,三天无理由+7*72小时售后在线,公司持有idc许可证,提供“云服务器、裸金属服务器、高防服务器、香港服务器、美国服务器、虚拟主机、免备案服务器”等云主机租用服务以及企业上云的综合解决方案,具有“安全稳定、简单易用、服务可用性高、性价比高”等特点与优势,专为企业上云打造定制,能够满足用户丰富、多元化的应用场景需求。
分享标题:Bamboobootstrapfailed:Faile-创新互联
网站URL:http://pwwzsj.com/article/jseoj.html